Method for scheduling and inventory management for a process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20040225579A1
SERIAL NO

10431310

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Managing manufacturing or other process is dependent on inventories of finished product. Inventories of final products are reviewed on a strictly periodic basis, the period being uniquely determined for that product at that time. When an inventory is found to be below a predetermined limit, a manufacturing run is proposed. The schedule for that manufacturing run is determined based on the process required for that product, and the capacity limitations of one or more of the processing steps. The demands of a processing step should not exceed its capacity. A Drum Buffer Rope scheduling method is used for this manufacturing run scheduling to keep it within the bounds set by the capacity-constrained resource(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIDWEST INDUSTRIES INCW292 S4498 HILLSIDE ROAD WAUKESHA WI 53189

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daiker, Robert L Odebolt, IA 1 2
Gebel, Clifford M Ida Grove, IA 1 2
Hudson, Ryan E Ida Grove, IA 1 2
Marron, Julie K Holstein, IA 1 2
Olson, Bruce P Ida Grove, IA 1 2
Peery, Galen O Kiron, IA 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation