Early hydrocarbon production system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20040238176A1
SERIAL NO

10491866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A subsea hydrocarbon reserve is exploited by intially drilling a first well (4) from a floating drilling vessel (2). A tree (8) is then installed on the well (4) and a production riser (10) is established between the well and the vessel for transferring production fluid from the first well (4) to the vessel (2) from where an off-loading hose (12) conveys the production fluid to a tanker (18). Production fluid is then extracted from the first well (4) via the production riser (10) which is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations to drill further wells (4', 20).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALPHA THAMES LTDESSEX HOUSE STATION ROAD UPMINSTER ESSEX RM14 2SU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Appleford, David Eric Epping, GB 29 460
Lane, Brian William Essex, GB 26 437

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation