Multilayer high-frequency circuit board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8164005
APP PUB NO 20080251288A1
SERIAL NO

12099875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer high-frequency circuit board includes a signal line, ground layers, and an interlayer circuit. A signal line where a high-frequency signal flows is formed in the signal line layer. The ground layers are laminated on both sides of the signal line layer, each of which is grounded. The interlayer circuit is provided in the signal line layer and includes a ground connecting portion connected to the ground layers and a signal line connecting portion connected to the signal line. One of the signal line connecting portion and the ground connecting portion surrounds an outer periphery of the other of the signal line connecting portion and the ground connecting portion concentrically with the one being separated from the outer periphery of the other along the signal line layer. An inner periphery of the one and the outer periphery of the other have a similar shape excluding a complete circle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kumamoto, Tsuyoshi Kawasaki, JP 5 27
Nakada, Taihei Kawasaki, JP 12 222
Suzuki, Ryota Kawasaki, JP 133 941
Tanabe, Masahiro Kawasaki, JP 20 143
Yamashita, Yuusuke Kawasaki, JP 5 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2023
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00