Buffer minimization in interface controller

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8284792
APP PUB NO 20080298383A1
SERIAL NO

11756940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, an apparatus comprises serializer/deserializer (SERDES) circuits. Each SERDES circuit is configured to transmit data on a respective lane to which the SERDES circuit is are coupled during use. The apparatus further comprises a transmit pipe coupled to the SERDES circuits. The transmit pipe comprises stages, and each stage is configured to process a maximum bandwidth unit (a maximum width of a port that is configurable on the lanes and smaller than a largest packet transmitted on the ports). In another embodiment, the apparatus comprises a transmit command queue; a transmit scheduler coupled to the transmit command queue; and a storage device coupled to the transmit scheduler that stores a scheduling calendar. The transmit scheduler is configured to schedule maximum bandwidth units for transmission on ports configured over the lanes on which packets are transmitted. The maximum bandwidth unit is smaller than a packet and is a maximum width of a port that is configurable on the lanes. The transmit scheduler is configured to schedule the maximum bandwidth units according to the scheduling calendar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • APPLE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, James Milpitas, US 240 6172

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00