Method of manufacturing a controlled porosity stent

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8205317
APP PUB NO 20090024199A1
SERIAL NO

11778430

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a stent includes forming a stent blank including a predetermined alloy composition, the alloy composition including at least base element and at least one sacrificial element and forming a stent framework from the stent blank. The method further includes removing at least a portion of the sacrificial element and forming at least one pore based on the removal. A method of manufacturing a vascular treatment system includes forming a stent blank including a predetermined alloy composition including at least one base element and at least one sacrificial element. The method further includes forming a stent framework and removing at least a portion of the sacrificial element. The method also includes forming at least one pore based on the removal, bending the stent framework to a delivery shape, and attaching the bent stent framework including the formed pores to a catheter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDTRONIC VASCULAR INC3576 UNOCAL PLACE SANTA ROSA CA 95403

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, Jeffrey W Santa Rosa, US 16 2403
Birdsall, Matthew J Santa Rosa, US 32 4217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 26, 2023
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00