Optimized CMP conditioner design for next generation oxide/metal CMP

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8657652
APP PUB NO 20090053980A1
SERIAL NO

12195600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A study of several key conditioner design parameters has been conducted. The purpose was to improve conditioner performance by considering factors such as wafer defects, pad life, and conditioner life. For this study, several key conditioner design parameters such as diamond type, diamond size, diamond shape, diamond concentration and distribution, were selected to determine their effect on CMP performance and process stability. Experimental validations were conducted. Conditioner specifications were matched to each specific CMP environment (intended application) in order to improve process stability and CMP performance particularly for emerging technology nodes. Several conditioner designs were developed and run successfully in the field. Significant planarity improvement for a 300 mm CMP process was achieved in accordance with one embodiment, and an increase of pad life and wafer polish rate was simultaneously achieved with another embodiment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAINT-GOBAIN ABRASIFS;SAINT-GOBAIN ABRASIVES, INC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baldoni, J Gary Norfolk, US 8 160
Hwang, Taewook Acton, US 11 164
Puthanangady, Thomas Shrewsbury, US 8 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00