Composite transport functions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8477600
APP PUB NO 20090185569A1
SERIAL NO

12266700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A network comprising a first layer processor (LP) configured to distribute a plurality of component communications to a plurality of component connections using a distribution table comprising a plurality of component communication identifiers (CCIDs) and the component connection associated with each CCID, a second LP configured to collect the packets from the component connections, and a composite connection coupled to the first LP and the second LP, wherein the composite connection comprises a plurality of the component connections and is configured to transport the component communications using the component connections, and wherein the distribution table and composite connection are configured such that component communications associated with at least the same CCID of a component communication takes the same path from the first LP to the second LP as from the second LP to the first LP.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUTUREWEI TECHNOLOGIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dunbar, Linda Plano, US 85 3732
Mack-Crane, T Benjamin Downers Grove, US 43 1408
Sultan, Robert Somers, US 45 1623
Yong, Lucy McKinney, US 46 1838

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00