Methods for treating “plunge zone,” heavy liquid, large tank, structural impediment and timing issues, when extinguishing tank fires

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8881839
SERIAL NO

11989406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for extinguishing a full, or substantially full, surface liquid tank fire including addressing large tank, difficult fuel, structural impediment, timing and plunge zone issues, the attack including throwing at least one primary stream over a tank wall, the stream landing with a force of impact in, and defining, a plunge zone; the method including potentially achieving flame collapse leaving a plunge zone flame and subsequently, at least for a period of time, diminishing force of impact per unit area of a primary stream upon said plunge zone flame; alternately the method includes achieving a partial flame collapse including collapse against back tank wall portions and subsequently diminishing stream impact force upon a plunge zone including moving a plunge zone forward in the tank; the method also includes extinguishing a full surface heavy liquid tank fire by teasing the fire prior to employing a non-feathered stream to create a foam blanket; the method may include restaging to create a secondary footprint, and/or coordinating the timing of addressing plunge zone, smiley face and secondary footprint issues; the method may also include teasing and/or rooster tailing structural impediments.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TYCO FIRE PRODUCTS LP1467 ELMWOOD AVENUE CRANSTON RI 02910

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Williams, Dwight P Vidor, US 32 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 11, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00