Production method for a workpiece composed of a fibre-composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8920698
SERIAL NO

12310113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a production method for a workpiece (15) composed of a fibre-composite material, having the following steps: at least one support means (3) is provided. A main material (6) composed of a pre-impregnated fibre semi-finished product and/or of a secondary material (7) are/is applied to the at least one support means (3) in order to form at least two blank-mould areas (1, 10), in such a manner that at least one of the at least two blank-mould areas (1, 10) has the main material, and at least one of the blank-mould areas (1, 10) has the secondary material. The blank-mould areas (1, 10) are pressure-bonded to one another to form a workpiece blank (14) such that the at least one support means (3) is provided on a surface of the workpiece blank (14). The at least one support means (3) and the secondary material (7) are removed from the workpiece blank (14) in order to form the workpiece (15).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS OPERATIONS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lengsfeld, Hauke Helmste, DE 24 230
Marquardt, Hans Fredenbeck, DE 34 583
Sander, Peter Bremen, DE 27 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00