System and method for energy production from sludge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8499471
APP PUB NO 20100043445A1
SERIAL NO

12543711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides, among other things, a system and process for drying a biosolid or sludge, such as wastewater sludge. The system and method include a fluidized bed dryer in which the sludge is dried. The fluidized bed includes bed media. In particular examples, the bed media is different than the sludge. The system and method can include additional features, such treating the sludge using a thermochemical process in a thermochemical reactor, such as a gasifier, to produce a fuel. The fuel is then combusted to produce energy and heat. The heat is recycled to the drier to help dry sludge. In particular examples, sludge input to the dryer is not first treated using a high-pressure dewatering technique. In some embodiments, the system and method include an anaerobic digester coupled to a combustion unit coupled to the dryer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOARD OF REGENTS OF THE NEVADA SYSTEM OF HIGHER EDUCATION ON BEHALF OF THE UNIVERSITY OF NEVADA RENO1664 N VIRGINIA ST UNR-DRI TECHNOLOGY TRANSFER OFFICE/321 RENO NV 89557

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coronella, Charles J Reno, US 7 43
Vasquez, Victor R Reno, US 2 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00