C-H bond amination and olefin aziridination with β-diketiminato copper catalysts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8471051
APP PUB NO 20100056806A1
SERIAL NO

12518189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One aspect of the present invention relates to a method for the transition metal (e.g., Cu(I)) mediated amidation of C—H bonds using electron-rich aliphatic azides. In certain embodiments, the methods are useful for the C—H insertion of nitrenes generated and stabilized by a β-diketiminato metal catalyst. In certain embodiments, said nitrenes are generated from organoazides, or by oxidation of the corresponding amine. Another aspect of the present invention relates to olefin aziridination using said β-diketiminato metal catalysts. In addition, the methods of the present invention include stereoselective C—H bond aminations and olefin aziridinatons. In certain embodiments, the methods are conducted in an aerobic environment. In certain embodiments, the present invention relates to the use of O2 as an oxidant, wherein water is the byproduct of oxidation; this fact avoids the generation of toxic byproducts and renders the methods atom economical.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEORGETOWN UNIVERSITY37TH AND O STREET NW WASHINGTON DC 20057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Warren, Timothy H McLean, US 3 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00