Methods and systems for optimizing production forecasts using statistically prioritized discrete modeling methodology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8856018
APP PUB NO 20100070315A1
SERIAL NO

12210291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer-based method for dynamic path regeneration in a production environment as a function of stochastic event-driven parameters and constraints is described. The method includes examining existing status codes, for a plurality of remaining production jobs, to determine a current status for a production unit, applying at least one of predecessor relationships and successor relationships for the remaining production jobs to the existing status codes, analyzing historical job performance statistics for a number of previous production units based on production job performance data associated with the previous production units, and providing a user interface that depicts the remaining production jobs in order of criticality, the order of criticality determined based on the existing status codes, the at least one of predecessor relationships and successor relationships, and the analysis of the historical job performance statistics.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Roberto Francisco-Yi Bellevue, US 161 112
Sundaram, Shankar Seattle, US 10 222
Wei, Tsao-Feng Medina, US 1 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00