Compound semiconductor substrate and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8552533
APP PUB NO 20100200956A1
SERIAL NO

12677627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing the compound semiconductor substrate having a reduced dislocation density at an interface between a Si substrate. Contaminants, such as organic matter and metal, on a surface of a Si substrate are removed whereby a flat oxide film is formed. The oxide film on the surface is removed by using an aqueous hydrogen fluoride solution, whereby hydrogen termination treatment is performed. Immediately after being subjected to the hydrogen termination treatment the temperature of the Si substrate is raised in a vacuum apparatus. If the substrate temperature is raised without any operation, the termination hydrogen is released. Before the hydrogen is released, pre-irradiation with As is performed. Thus, an interface between the Si substrate and the compound semiconductor layer is prepared. Several minutes later, irradiation with Ga and As is performed. Thereby, the compound semiconductor is formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASAHI KASEI EMD CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Takashi Tokyo, JP 395 3556
Kunimi, Yoshihisa Tokyo, JP 1 1
Miyahara, Masatoshi Tokyo, JP 4 2
Shibata, Yoshihiko Tokyo, JP 21 460

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00