Busbar supports and methods of their use for battery systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8815429
APP PUB NO 20100247998A1
SERIAL NO

12628786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery system comprises a plurality of battery subunits, each subunit comprising a heatsink and at least one battery cell with a positive terminal and a negative terminal; where each heatsink has a respective busbar support mounted to it, and each busbar support includes first and second slots through which, respectively, a positive and a negative terminal of the at least one battery cell for that subunit passes, wherein a first busbar is located above and held at least in part by the first busbar support and is electrically connected to the negative terminal passing through the first slot in the first busbar support; and a second busbar is located above and held at least in part by the first busbar support and electrically connected to the positive terminal passing through the second slot in the first busbar support.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WANXIANG CLEAN ENERGY USA ACQUISITION LLC39000 SEVEN MILE RD LIVONIA MI 48152

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Butt, Shazad M Troy, US 9 246
Hostler, Jonathan E Canton, US 11 305
Ijaz, Mujeeb Leonard, US 28 620

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00