Prosthetic heart valve system with positioning markers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9980818
SERIAL NO

12716062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exemplary two-stage prosthetic heart valve system has a radially expandable base stent implanted within a native valve annulus. The base stent desirably has three position markers projecting in the axial direction from the outflow end of the base stent to assist in aligning the stent with respect to the commissures of the native valve. The two-stage heart valve system also has a valve component that is delivered to and mounted within the base stent in a separate or sequential operation after the base stent has been anchored within the annulus. The valve component in certain embodiments comprises a hybrid valve component that includes a conventional, non-expandable surgical valve that is modified to include an expandable coupling stent that can be expanded to engage the inner surface of the base stent, thereby anchoring the valve component to the base stent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EDWARDS LIFESCIENCES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chau, Mark Aliso Viejo, US 80 11805
Zeng, Qinggang Irvine, US 54 2190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00