Blade set for jaws used in rail breaking demolition equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8231071
APP PUB NO 20110031338A1
SERIAL NO

12537567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blade set associated with jaws for demolition equipment used to break raiload rails includes a bottom blade associated with a bottom jaw and a top blade associated with a top jaw, wherein the bottom jaw and the top jaw are rotatable relative to one another. The bottom blade includes two spaced-apart support rails separated by a cavity, while the top blade includes a single raised knife rail positioned and central to the cavity and rotatable toward the cavity. The raised support rails associated with the bottom blade and the raised knife rail associated with the top blade have spaced recesses across their width which enhance the ability of the jaw sets to grab and retain work pieces. Additionally, the top blade has an outwardly tapering shape, such that upon completing a cutting operation a remaining portion of the severed railroad rail may be held and clamped by the jaw set for transportation or further processing. The top blade additionally may be marked with indicia, such as red paint, such that the machine operator may properly orient the top blade during a cutting operation to maximize safety.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAMUN MICHAEL R3263 AUSTINTOWN-WARREN ROAD MINERAL RIDGE OH 44440

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramun, John R Poland, US 40 516
Ramun, Michael Richard Mineral Ridge, US 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00