Systems and methods for circulating out a well bore influx in a dual gradient environment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8517111
APP PUB NO 20110061872A1
SERIAL NO

12878550

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for drilling subsea wells bores with dual-gradient mud systems include drilling the subsea well bore while employing a subsea pumping system, a subsea choke manifold and one or more mud return risers to implement the dual gradient mud system. When a well bore influx is detected, the well bore is shut in, and components determine if pressure control may be used to circulate the influx out of the well bore, the size of the influx, and how much the mud system weight will need to be reduced to match the dual gradient hydrostatic head before the influx reaches the subsea pump take point. The subsea pumping system, subsea choke manifold, and mud risers are isolated while the influx is circulated up one or more fluid passages in the drilling riser package using the surface pump, through the wellhead, and out the surface choke manifold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BP CORPORATION NORTH AMERICA INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mix, Kurt Edward Katy, US 1 24
Myers, Robert L Houston, US 32 503

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00