System and method for synchronization, power control, calibration, and modulation in communication transmitters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8208583
APP PUB NO 20110085619A1
SERIAL NO

12969843

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is provided for processing a communication signal including a baseband amplitude component and a baseband phase component. The system includes an amplitude predictor configured for closed-loop pre-distortion of a baseband amplitude component, an amplitude lookup table configured for open-loop pre-distortion of the baseband amplitude component, and an amplitude interpolator configured to build up the amplitude lookup table during a closed-loop calibration period. The system also includes a phase predictor configured for closed-loop pre-distortion of a baseband phase component, a phase lookup table configured for open-loop pre-distortion of the baseband phase component, and a phase interpolator configured to build up the phase lookup table during a closed-loop calibration period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EAGLE TECHNOLOGY, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmed, Walid Khairy Mohamed Tinton Falls, US 26 314
Li, Qing Princeton Junction, US 754 6855
Reddy, Ajit Kumar Matawan, US 8 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 26, 2023
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00