Steelmaking facility comprising a direct reduction plant and an electric-arc furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8771397
APP PUB NO 20110094337A1
SERIAL NO

12988489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steelmaking plant including a pressurized direct reduction reactor for continuous production of hot direct reduced iron with a batch-melting furnace and a standby cooler, all three being capable of being situated side-by-side, with such DRI being able to be alternatively fed to the furnace or to the cooler. The furnace is selectively charged through a diverter valve by a pneumatic transport system with the hot DRI being entrained in a carrier gas fed into a receiving bin (having an upper DRI/gas disengagement space and a lower DRI buffer portion). A pressurized charge of the DRI accumulated in such disengaging/buffer bin is periodically fed down into a dosing/depressurization bin which in turn depressurizes the DRI and feeds a batch of DRI down into the furnace. Upon sensing that the buffer portion is full, the DRI is then pneumatically diverted to the cooler, such as during furnace maintenance shut down.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DANIELI & C OFFICINE MECCANICHE S P A33042 BUTTRIO
HYL TECHNOLOGIES S A DE C VN L 66450

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becerra-Novoa, Octavio Jorge Monterrey, MX 1 3
Garza-Rodriguez, Gilberto Nuevo Leon, MX 1 3
Tavano, Andrea Tavagnacco, IT 6 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00