Monolithic, optoelectronic semiconductor body and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8643034
APP PUB NO 20110101390A1
SERIAL NO

12920317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optoelectronic semiconductor body comprises a semiconductor layer sequence which is subdivided into at least two electrically isolated subsegments. The semiconductor layer sequence has an active layer in each subarea. Furthermore, at least three electrical contact pads are provided. A first line level makes contact with a first of the at least two subsegments and with the first contact pad. A second line level makes contact with the second of the at least two subsegments and with a second contact pad. A third line level connects the two subsegments to one another and makes contact with the third contact pad. Furthermore, the line levels are each arranged opposite a first main face, wherein the first main face is intended to emit electromagnetic radiation that is produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSRAM OPTO SEMICONDUCTORS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Engl, Karl Niedergebraching, DE 66 775
Hoeppel, Lutz Alteglofsheim, DE 38 524
Rode, Patrick Regensburg, DE 38 752
Singer, Frank Regenstauf, DE 147 437
Strassburg, Martin Tegernheim, DE 35 351

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00