Method of manufacturing Fe and Ni containing material and cobalt containing material using recycling residue of spent catalyst and method of manufacturing raw material for stainless using the Fe and Ni containing material and method of manufacturing Fe-Ni alloy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8882882
SERIAL NO

12674984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of manufacturing Fe and Ni-containing material and Co-containing material from petrochemical desulfurization residue containing Fe and Ni or Fe and Co, manufacturing raw material for stainless steel using the Fe and Ni-containing material, and manufacturing ferro-nickel using the Fe and Ni-containing material. The method of manufacturing Ni and Fe-containing material includes acid-treating Ni and Fe-containing residue to remove alkali therefrom; drying the residue and heat treating the residue in a temperature range from 600° C. (degree Centigrade) to 1300° C. (degree Centigrade) in a reducing atmosphere to reduce Ni and Fe oxides in the residue into metal state; leaching a resultant product obtained by the reduction using acid to selectively dissolve Ni and Fe; filtering the acid leached product to obtain a solution containing Ni and Fe ions; neutralizing the solution containing Ni and Fe ions using alkali to produce Fe,Ni hydroxide; and filtering and drying a resultant product obtained by the neutralization.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY67 CHEONGAM-RO NAM-GU POHANG-SI GYEONGSANGBUK-DO 37673

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jae Young Pohang, KR 299 1804

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 11, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00