Shape-memory alloy-driven power plant and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8299637
APP PUB NO 20110140456A1
SERIAL NO

12639828

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant configured for converting thermal energy to electricity includes a source of thermal energy provided by a temperature difference between a primary fluid having a first temperature and a secondary fluid having a second temperature that is different from the first temperature. The plant also includes a collector configured for enhancing the temperature difference between the primary and secondary fluids, and a heat engine configured for converting at least some thermal energy to mechanical energy. The heat engine includes a pseudoplastically pre-strained shape-memory alloy disposed in heat exchange relationship with each of the primary and secondary fluids. Further, the plant includes a generator driven by the heat engine and configured for converting mechanical energy to electricity. A method of utilizing a naturally-occurring temperature difference between air and/or water to change a crystallographic phase of the shape-memory alloy to convert the temperature difference into mechanical energy is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DYNALLOY, INC.;GM GLOBAL TECHNOLOGY OPERATIONS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, James Holbrook Costa Mesa, US 30 294
Browne, Alan L Grosse Pointe, US 345 6404
Johnson, Nancy L Northville, US 367 5735
Wittorf, Marten Ingelheim, DE 35 292

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00