Workforce management system for forecasting and scheduling work items that cross intervals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20110145032A1
SERIAL NO

12636804

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A forecast and plan generation process for a workforce management (WFM) system implements an algorithm to calculate staffing requirements when average handling time (AHT) is longer than a data collection statistics period and/or a work item is in progress of being handled in more than one interval. A schedule generation process schedules an agent for intervals after a work item is provided/connected to the agent, preferably up to an including an interval when the work item terminates (based on the AHT of the work item and a simulated arrival time of the work item). Additional agents are scheduled for new work items that are forecasted to arrive in an interval, in addition to the agents that may already be connected to a contact.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IEX CORPORATION2425 N CENTRAL EXPRESSWAY RICHARDSON TX 75080

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stearns, William Nathan Arlington, US 6 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation