Multi-story buildings from prefabricated concrete components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8341902
APP PUB NO 20110225905A1
SERIAL NO

13052047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Multi-story buildings assembled from pre-cast concrete components produced in a component factory to form earthquake-resistant buildings with lower cost and faster construction time. The multi-story building structure comprising a plurality of piles and pile caps; prefabricated concrete column components; prefabricated concrete beam components; prefabricated concrete floor components; prefabricated concrete stairs components and prefabricated concrete wall components. Each pile cap unites at least two piles to one column; each column component has a groove on each side of the column component for placement of the corresponding sides of prefabricated wall components; and each beam component comprises grooves on the bottom and top sides of the beam for placement of wall components; and openings are located in the body of the beam. Floor components, stairs components, and wall components are made of concrete that are pre-cast with a predetermined shape, size and strength as described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kusuma, Trisna Widjaja Jakarta Barat, ID 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00