Electrical connections for anodized thin film structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8826528
SERIAL NO

13131740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Approaches for formation of a circuit via which electrically connects a first thin film metallization layer a second thin film metallization layer are described. Via formation involves the use of an anodization barrier and/or supplemental pad disposed in a via connection region prior to anodization of the first metallization layer. The material used to form the barrier is substantially impermeable to the anodization solution during anodization, and disrupts the formation of oxide between the electrically conducting layer and the barrier. The supplemental pad is non-anodizable, and is covered by the barrier to substantially prevent current flow through the pad during anodization. Following anodization, the barrier is removed. If the supplemental pad is sufficiently conductive, it can be left on the first metallization layer after removal of the barrier. The second metallization layer is disposed over the anodized layer, making electrical contact with the first electrically conductive layer in the via connection region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haase, Michael A St. Paul, US 186 10493
Theiss, Steven D Woodbury, US 27 4423

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00