Rail road car and truck therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789886
SERIAL NO

13225449

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railroad car truck for a railroad freight car, such as an autorack car, has a bolster mounted cross-wise between two sideframes. The bolster ends are mounted on respective spring groups carried by the sideframes. The bolster can translate laterally relative to the sideframes. The side frames are mounted to swing laterally relative to the wheel sets, and hence relative to the rails. Resistance to lateral deflection is provided by the resistance of the sideframes to the pendulum swinging motion, and by shear in the spring groups. The truck has a doubled damper arrangement of dampers in a four-cornered layout at each end of the bolster, giving a flexing resistance to yaw between the sideframes and the bolster ends. The doubled damper arrangement works against large wear plates mounted on the sideframe columns. The large wear plates are mounted normal to the dampers and square to the sideframes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATIONAL STEEL CAR LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forbes, James W Campbellville, CA 117 2199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00