Loading device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8701856
APP PUB NO 20120181140A1
SERIAL NO

13377059

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charging device capable of moving a distribution chute with a simple structure and easy control is provided. The charging device includes: a frame; a rotation axis set in the frame; a rotor supported by the frame and being rotatable around the rotation axis; an adjustment axis set in the rotor and intersecting with the rotation axis at a first angle; a holder supported by the rotor and being rotatable around the adjustment axis; a distribution chute fixed to the holder and extending in a direction intersecting with the adjustment axis at a second angle; a rotation drive motor fixed to the frame and rotating the rotor against the frame; a transmission-side bevel gear supported by the frame and being rotatable around the rotation axis; a holder-side bevel gear fixed to the holder and being meshed with the transmission-side bevel gear; and an adjustment drive motor fixed to the frame and rotating the holder against the rotor by rotating the transmission-side bevel gear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL ENGINEERING CO LTDTOKYO 141-8604

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tomisaki, Shin Kitakyusyu, JP 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 22, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00