Internal combustion engine having eight cylinders in a V-configuration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8468987
APP PUB NO 20120210960A1
SERIAL NO

13462447

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine having eight cylinders in V-configuration, wherein a first cylinder bank and a second cylinder bank are disposed opposite one another. The internal combustion engine includes a cross-plane crankshaft and has a firing order of a 90° crank angle from cylinder to cylinder. An intake camshaft and an exhaust camshaft are associated with each cylinder bank for actuating at least one intake gas exchange valve and one exhaust gas exchange valve for each cylinder. The gas exchange intake valves that are actuated at a 90° crank angle in the same cylinder bank have a larger valve stroke than the gas exchange intake valves in same cylinder bank actuated immediately prior thereto. The gas exchange intake valves in the same cylinder bank actuated immediately prior thereto have a smaller valve stroke than all the remaining gas exchange intake valves of both cylinder banks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFTPETUELRING 130 MUENCHEN 80809

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kadura, Ralf Landshut, DE 1 7
Kirchweger, Wolfram Munich, DE 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00