Building anchor systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8806836
APP PUB NO 20120227351A1
SERIAL NO

13395684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building anchor system includes a pair of elongate anchor rods (1,2), an anchor rod coupling joint (3) for joining the anchor rods end-on-end, the anchor rod coupling joint comprising or including a sleeve (4, 5, 6 & 7) for connection to an end of one of the anchor rods (1) a slideable arm (8) receivable in the sleeve for connection to an end of the other anchor rod (2) a closed slot within the arm or sleeve for slideably receiving the free end of a stop member (13) by which movement of the anchor rods along their major axis is possible to the extent allowed by the length of the slot, and frictional adjustment means (6,7) acting between the arm and the sleeve by which they may be joined and by which the force required to move them with respect to each other can be selectively varied. The invention also extends of a method of preventing or inhibiting catastrophic structural failure of a building by installing one or more anchor systems of the type described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CINTEC INTERNATIONAL LIMITEDNEWPORT GWENT NP20 4PH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
D'Ayala, Dina Bath, GB 1 16
James, Peter Gwent, GB 62 388
Lee, Dennis Newport, GB 79 2535
Paganoni, Sara Bristol, GB 1 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00