Switch system and method for the monitoring of virtual optical paths in an optical burst switched (OBS) communication network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8577221
APP PUB NO 20120275781A1
SERIAL NO

13509533

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides an optical burst switch in an Optical Burst Switched (OBS) communication network, said optical burst switch comprising means for monitoring and maintaining mesh of virtual optical paths from a communication node to a plurality of other communication nodes, arranged in a ring network, enabling traffic data to be transmitted and/or received between nodes via a physical optical path. The switch also provides means for sending a data packet probe on a virtual path from a node to each other node in the OBS communication network, wherein data packet probe information received at said switch provides information of availability of the physical optical path for sending traffic data between nodes. The switch can be configured such that the rate at which this path monitoring is scheduled guaranteeing less than 50 ms protection switch in the event of monitoring a failed or degraded path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTUNE NETWORKS LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Courtney, John Dublin, IE 9 443
Farrell, Tom Dublin, IE 8 33
McDonald, David Dublin, IE 76 1953
Shields, Jim Dublin, IE 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00