Primary-side control of a switching power converter with feed forward delay compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9351356
APP PUB NO 20120306407A1
SERIAL NO

13486947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic system includes controller to control a switching power converter to provide power to a load. To control the amount of power provided to the load, in at least one embodiment, the controller senses a current value representing a current in the switching power converter and detects when the current value reaches a target peak value. However, due to delays in the controller and/or the switching power converter, the detected target peak value will not be the actual current peak value generated by the switching power converter. In at least one embodiment, the controller adjusts the detected target peak value with a post-detection delay compensation factor to generate a delay compensated current value that more accurately represents an actual peak current value associated with the current in the switching power converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIGNIFY HOLDING B V5656 AE EINDHOVEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grisamore, Robert T Austin, US 11 201
He, Zhaohui Austin, US 31 297
Kost, Michael A Cedar Park, US 65 1299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00