Cultivation air seeder having sequentially operated tools

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9031749
APP PUB NO 20120316736A1
SERIAL NO

13157943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When the operator of a cultivation air seeder shifts the tractor valve to raise the cultivators and openers from the ground as the seeder prepares to turn around at the end of a field, the operating and control system of the seeder causes the cultivators to be raised first, followed in sequence by the trailing openers. The seed meter turns off as soon as the cultivators leave their lowered position, but the blower stays on so that seeds in the conduits downstream from the meter continue to be delivered to and deposited into the ground by the openers until the cultivators reach their raised position, whereupon the openers are raised. Depending upon the particular seeding mode selected by the operator, the cultivators and openers either lower simultaneously as the operator shifts the tractor valve to the lowering position when starting down the next pass, or the cultivators are lowered first, followed in sequence by the openers. Regardless of the selected seeding mode, the seed meter turns on as soon as the cultivators reach their lowered positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GREAT PLAINS MANUFACTURING, INC.;GREAT PLAINES MANFACTURING, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hubalek, Verne A Lindsborg, US 15 91
Riffel, Jacob R Salina, US 8 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00