Method of producing thermoelectric material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9978924
SERIAL NO

13166860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a nanocomposite thermoelectric material having a plurality of nanoparticle inclusions. The process includes determining a material composition to be investigated for the nanocomposite thermoelectric material, the material composition including a conductive bulk material and a nanoparticle material. In addition, a range of surface roughness values for the insulating nanoparticle material that can be obtained using current state of the art manufacturing techniques is determined. Thereafter, a plurality of Seebeck coefficients, electrical resistivity values, thermal conductivity values and figure of merit values as a function of the range of nanoparticle material surface roughness values is calculated. Based on these calculated values, a nanocomposite thermoelectric material composition or ranges of compositions is/are selected and manufactured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banerjee, Debasish Ann Arbor, US 164 1614
Kita, Takuji Susono, JP 19 79
Zhang, Minjuan Ann Arbor, US 96 1789

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00