Bearing device for axle of railway vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8790014
APP PUB NO 20130011090A1
SERIAL NO

13635939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An axle bearing device includes an inner ring fixed to an axle of a railway vehicle, an outer ring fixed to a journal box of the railway vehicle, and double row tapered rollers arranged between raceway surfaces of the inner ring and raceway surfaces of the outer ring. An opening portion between the inner ring and the outer ring is sealed by a labyrinth seal including at least one axial labyrinth extending in an axial direction and at least one radial labyrinth extending in a radial direction. At least one of the at least one axial labyrinth and the at least one radial labyrinth which form the labyrinth seal is formed between an outer-ring-side sealing member mounted to the outer ring and the inner ring or between the outer-ring-side sealing member mounted to the outer ring and an inner-ring-side sealing member mounted to the inner ring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NTN CORPORATIONOSAKA-SHI OSAKA 530-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kataoka, Masahiko Kuwana, JP 10 96
Murakami, Fumihiro Kuwana, JP 4 20
Shimizu, Yasuhiko Kuwana, JP 36 1089
Shimizu, Yasuhiro Kuwana, JP 169 1802
Ueno, Masanori Kuwana, JP 33 278

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00