Reinforcement structure of rectangular flat metal plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8615969
APP PUB NO 20130014457A1
SERIAL NO

13634575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a reinforcement structure of a rectangular flat metal plate, which is provided with: a rectangular flat metal plate that is predominantly subjected to in-plane shear, and supports a compressive load as necessary; strip-like rectangular section members that are spliced in parallel with both side edges of the flat plate in the longitudinal direction so as to reinforce the flat plate; and a plurality of square tube-like members that are parallelly arranged for each constant interval in the shorter side direction of the flat plate, and are spliced on one side surface of the flat plate, or are spliced so as to overlap one another across the flat plate between both surfaces of the front and back of the flat plate, wherein the torsional rigidity and torsional strength of the rectangular flat metal plate are increased to ensure a yield shear load, and shear yield strength can be stably maintained even in the transition of shear deformation after the yield.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.;SUZUKI LABORATORY OF MATERIAL AND STRUCTURE CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suzuki, Toshiro Kawasaki, JP 104 1788

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00