Injector opening delay diagnostic strategy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8679691
APP PUB NO 20130034788A1
SERIAL NO

13204012

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for detecting an intermittent failure of an injector that injects hydrogen gas fuel into the anode side of a fuel cell stack in a fuel cell system. The method includes operating the injector at a fixed injector pulse width and frequency, which causes the stack to generate a constant current, and therefore, a constant fuel consumption rate. While at a constant current, the injector is commanded to a constant duty cycle and frequency that matches the rate of fuel consumption in the fuel cell system. The resulting fuel pressure feedback is then monitored, and if it diverges from a defined nominal value, either in a constant or oscillatory manner, it can be determined that the injector has an intermittent opening failure. In one embodiment, the determination of the injector failure is performed during a shut-down sequence of the fuel cell system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C22-A68 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baader, Nathan Hemlock, US 2 5
Lang, Matthew A Churchville, US 11 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00