Manufacture work machine for controlling a plurality of work-element performing apparatuses by central control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10098269
APP PUB NO 20130046402A1
SERIAL NO

13643437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacture work machine for preforming a manufacture work, including: work-element performing apparatuses each configured to perform one of work elements of the manufacture work, and a central control device to control the apparatuses in a centralized manner, such that motion commands for one motion to be performed by one of the apparatuses are sequentially transmitted, wherein each apparatus has an individual control device to control an operation of said each apparatus and at least one operating device for performing a work element corresponding to said each apparatus, and wherein the individual control device is configured to recognize a matter of the motion command transmitted from the central control device and is configured to control an operation of each of the at least one operating device so as to permit one of the apparatuses to which the individual control device belongs to perform one motion corresponding to the motion command.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI MACHINE MFG CO LTDAICHI CITY AICHI PREFECTURE JAPAN CHIRYU CITY AICHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furukawa, Kazuya Chiryu, JP 38 291
Ito, Takashi Toyota, JP 587 7807
Iwaki, Noriaki Hekiman, JP 43 199
Kodama, Seigo Yatomi, JP 33 415
Tsutsumi, Hideyuki Kariya, JP 13 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00