Cement composition and process for producing cement composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8641819
APP PUB NO 20130068140A1
SERIAL NO

13701278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cement composition, and a process for producing a cement composition, wherein the cement composition has the Sr content of 0.065 mass % to 1.0 mass % and the MgO content of greater than 1.0 mass % to 3.0 mass %. The process for producing a cement composition comprises a step (A) of adjusting the basic raw material units of raw materials selected from the group consisting of limestone, silica stone, coal ash, clay, blast furnace slag, soil generated by construction work, sewage sludge, hydrocake and iron sources so that the cement composition has the Sr content of 0.065 mass % to 1.0 mass % and the MgO content of greater than 1.0 mass % to 3.0 mass %, blending the adjusted raw materials and burning to produce cement clinker, and a step (B) of mixing the cement clinker with gypsum and an admixture of limestone and blast furnace slag followed by grinding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UBE CORPORATION1978-96 OAZA KOGUSHI YAMAGUCHI-KEN UBE-SHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itoh, Takayasu Ube, JP 1 5
Mikami, Hiroshi Ube, JP 29 184
Sawabe, Norihiko Ube, JP 1 5
Tonokohchi, Hitoshi Ube, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00