Method to make a multilayer circuit board with intermetallic compound and related circuit boards

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8904632
SERIAL NO

13242155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is for making a multilayer circuit board from circuit board layers, each including a dielectric layer and conductive traces thereon including a first metal. The method includes forming a through-via in a first circuit board layer, plating the through-via with the first metal, and coating a second metal onto the first metal of the first circuit board layer, the plated through-via, and the first metal. The method also includes aligning the first and second circuit board layers together so that the plated through-via of the first circuit board layer is adjacent a feature on the second circuit board layer, and heating and pressing the aligned first and second circuit board layers so as to laminate the dielectric layers together and form an intermetallic compound of the first and second metals bonding adjacent metal portions together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HARRIS CORPORATION1025 WEST NASA BOULEVARD MELBOURNE FL 32919-0001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rendek,, Jr Louis Joseph West Melbourne, US 34 177
Rodriguez, Casey P Indialantic, US 1 3
Shacklette, Lawrence Wayne Melbourne, US 25 282
Weatherspoon, Michael Raymond West Melbourne, US 20 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00