Cast rotor and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8925182
SERIAL NO

13275535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a rotor assembly including a cast rotor frame includes positioning a preheated rotor core defining a plurality of passages in a mold cavity such that the mold cavity and the rotor core define the rotor frame including a plurality of conductor bars defined by the plurality of passages in fluid communication with first and second end portions of the mold cavity. Molten metal is quiescently introduced into the mold cavity through an ingate and simultaneously flowed through the plurality of passages prior to filling at least one of the first and second end portions of the mold cavity to form the cast rotor frame. Entrained air and impurities may be displaced from the passages by the flow of molten metal and vented or entrapped by a biscuit. The rotor frame and conductor bars thus formed may be characterized by high conductivity, negligible porosity, and minimal oxides.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coleman, Kevin P Livonia, US 7 56
Wang, Qigui Rochester Hills, US 159 404

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 6, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00