Method for producing a photovoltaic solar cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9023682
APP PUB NO 20130095595A1
SERIAL NO

13704683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a photovoltaic solar cell, including the following steps: A. texturizing a front (2) of a semiconductor substrate; B. generating a selective emitter doping on the front (2) of the semiconductor substrate by generating on the front (2) a first low-doped region (4) and a local high-doped region (3) within the first low-doped region; and C. applying at least one metal emitter contact structure to the front (2) of the semiconductor substrate, at least in the regions of local high doping, wherein, between method steps B and C, a respective silicon oxide layer (5a, 5b) is generated in a method step B1 simultaneously on the front and back of the semiconductor substrate via thermal oxidation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANWHA SOLUTIONS CORPORATION86 (JANGGYO-DONG) CHEONGGYECHEON-RO JUNG-GU SEOUL 04541 04541

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biro, Daniel Freiburg, DE 23 86
Jager, Ulrich Freiburg, DE 18 91
Kastner, Gero Freiburg, DE 1 1
Mack, Sebastian Freiburg, DE 8 16
Preu, Ralf Freiburg, DE 15 98
Wolf, Andreas Freiburg, DE 116 1158

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00