Acquisition of information for a construction site

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222771
APP PUB NO 20130096873A1
SERIAL NO

13652232

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for acquiring information for a construction site are provided. One system includes a base unit positioned within a construction site by a user. A computer subsystem of the base unit determines a position of the base unit with respect to the construction site. The system also includes a measurement unit moved within the construction site by a user. The measurement unit includes one or more elements configured to interact with light in a known manner. An optical subsystem of the base unit directs light to the element(s) and detects the light after interacting with the element(s). The computer subsystem is configured to determine a position and pose of the measurement unit with respect to the base unit based on the detected light. The measurement unit includes a measurement device used by the measurement unit or the base unit to determine information for the construction site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KLA-TENCOR CORPORATIONONE TECHNOLOGY DRIVE MILPITAS CA 95035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhaskar, Kris San Jose, US 36 1623
Levy, Ady Sunnyvale, US 96 3764
Rosengaus, Eliezer Palo Alto, US 38 1138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00