Method and apparatus for regulating the sampling phase

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9065629
APP PUB NO 20130101075A1
SERIAL NO

13655933

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention relate to methods and circuits for controlling the sampling phase of a signal that is to be regenerated by sampling, particularly a serial communication signal, having method steps or means for oversampling the signal in order to ascertain samples of the signal during predetermined sampling phases, for determining differential errors between the samples during different instances of the predetermined sampling phases, for determining a differential error rate between the samples to at least one first and at least one second sampling phase on the basis of the ascertained differential errors, and for comparing at least two differential error rates based on at least two different sampling phase pairs in order to ascertain a decision concerning which of the predetermined sampling phases can be selected as a reference sampling phase for correctly regenerating the signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AGGERMAN NOE BE BERG NEUBIBERG BAVARIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Helmschmidt, Juergen Gilching, DE 7 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00