Method for producing thermoelectric conversion material, thermoelectric conversion material, and production apparatus used in the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9255014
APP PUB NO 20130101733A1
SERIAL NO

13807809

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a thermoelectric conversion material composed of a metal A having an alkali metal or alkaline earth metal, a transition metal M, and oxygen O, and represented by AxMyOz, where x, y, and z are valences of the respective elements, includes the steps of: using a massive metal oxide as the thermoelectric conversion material and a salt in a solid, liquid or gaseous state; causing a diffusion reaction between the oxide and the salt; and forming the thermoelectric conversion material having aligned crystal orientation. A production apparatus includes a reactor into which the oxide and the salt are introduced, and a heating means for heating the oxide and the salt within the reactor to promote the diffusion reaction. Thereby, the thermoelectric conversion material having efficiency is produced more simply and at lower cost than a production of the single crystal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYUSHU INSTITUTE OF TECHNOLOGY1-1 SENSUI-CHO TOBATA-KU KITAKYUSHU-SHI FUKUOKA 804-8550

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishiwaki, Akifumi Osaka, JP 3 9
Shimozaki, Toshitada Fukuoka, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00