Fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8911916
SERIAL NO

13653407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell includes a membrane electrode assembly, a first separator, and a second separator. The membrane electrode assembly includes a solid polymer electrolyte membrane, a first electrode, a second electrode, and a resin frame member. The membrane electrode assembly includes a power generation section and a stepped section. The power generation section is located in an interior space of the resin frame member. The solid polymer electrolyte membrane is provided between the first electrode and the second electrode in the power generation section. The stepped section is located on an outer side of the first electrode. The solid polymer electrolyte membrane is provided between the second electrode and the resin frame member in the stepped section. A magnitude of an interference in the stepped section is set to be smaller than a magnitude of an interference in the power generation section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Takashi Wako, JP 514 6728
Kawaharada, Mihoko Wako, JP 4 8
Shinkai, Hiroshi Wako, JP 24 324
Sugiura, Seiji Wako, JP 84 524
Tanaka, Kenichi Wako, JP 309 3206
Tanaka, Yukihito Wako, JP 30 140
Urata, Kenta Wako, JP 17 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00