Turbine of a turbomachine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9255480
APP PUB NO 20130104550A1
SERIAL NO

13284068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbine of a turbomachine is provided and includes opposing endwalls defining a pathway for a fluid flow and a plurality of interleaved blade stages and nozzle stages arranged axially along the pathway. The plurality of the blade stages includes a last blade stage at a downstream end of the pathway and a next-to-last blade stage upstream from the last blade stage. The plurality of the nozzle stages includes a last nozzle stage between the last blade stage and the next-to-last blade stage and a next-to-last nozzle stage upstream from the next-to-last blade stage. At least one of the next-to-last blade stage and the next-to-last nozzle stage includes aerodynamic elements configured to interact with the fluid flow and to define a throat distribution producing a tip strong pressure profile in the fluid flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bielek, Craig Allen Greenville, US 26 689
Siden, Gunnar Leif Greenville, US 30 469
Smith, Paul Kendall Simpsonville, US 13 88
Vandeputte, Thomas William Scotia, US 12 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00