Optical receiver and optical transmission system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8855503
SERIAL NO

13808488

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Optical receiver 300 uses two optical delay detectors 223 (set such that the delay times T are equal to symbol time and the phase differences are zero and 90 degrees) to receive an optical multilevel signal 215 and the output signals are A/D converted, thereafter subjected to retiming processes, and then subjected to a differential phase detection, thereby detecting a differential phase at a symbol center time point. In the receiver, the detected differential phase is integrated for each symbol and thereafter combined with an amplitude component obtained from a separately disposed optical intensity receiver, thereby reproducing an optical electric field. Thereafter, a wavelength dispersion compensation circuit (231) of a time period T is used to compensate for the wavelength dispersion of the transmission path. Moreover, an electric or optical Nyquist filter may be inserted to perform a band limitation, thereby enhancing the wavelength dispersion compensation effect.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kikuchi, Nobuhiko Tokyo, JP 43 1052

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00