Motor controller

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8818596
APP PUB NO 20130110334A1
SERIAL NO

13576103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a technology capable of ensuring drivability of an electric vehicle while preventing thermal destruction of its parts and deterioration of a battery, caused by an LC resonance. The present specification discloses a motor controller for an electric vehicle having a battery, a converter circuit, an inverter circuit, a smoothing capacitor, and a motor, the motor controller configured to control a drive of the motor by controlling an operation of the inverter circuit. In this motor controller, an operating region of the motor that causes a resonance of an LC circuit configured by a reactor of the converter circuit and the smoothing capacitor is set as a resonance region. In this motor controller, execution of square-wave control on the motor is permitted only over a predetermined time period, when the converter circuit is not boosting the DC power and an operating point of the motor is included in the resonance region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-SHI AICHI 4488661 ?4488661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asami, Takayuki Toyota, JP 6 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00