Computing device and method for generating measurement program of product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9158297
APP PUB NO 20130110461A1
SERIAL NO

13552655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method for generating a measurement program of a product, a CAD file of the product is read and attribute data of the product is obtained from the CAD file. By creating a mesh over the attribute data of the product using a plurality of triangles, the method obtains coordinate information of measuring points of the product from the CAD file, arranges the measuring points of the product into one or more geometrical elements using a curve fitting method, and obtains measuring information of each geometrical element. By integrating the measuring information of each of the one or more geometrical elements into a predefined program model, a measurement program can be generated and displayed on a display device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTDNEW TAIPEI CITY
HONG FU JIN PRECISION INDUSTRY (SHENZHEN) CO LTD518109 NO TWO NO TENTH EAST RING ROAD PINUS TABULAEFORMIS INDUSTRIAL ZONE LONGHUA TOWN BAOAN DISTRICT GUANGDONG SHENZHEN 2 SHENZHEN CITY GUANGDONG PROVINCE 518100

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chih-Kuang New Taipei, TW 307 961
Rao, Jin-Gang Shenzhen, CN 9 11
Wu, Xin-Yuan Shenzhen, CN 152 502

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00