Transparent conductive film, substrate with transparent conductive film, and organic electroluminescence element using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9017807
APP PUB NO 20130122279A1
SERIAL NO

13812013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transparent conductive film includes a first transparent resin layer including a plurality of thin metallic wires, a second transparent resin layer containing a conductive polymer, and a third transparent resin layer provided between the first transparent resin layer and the second transparent resin layer. The second transparent resin layer contains a resin which is soluble in water, and the third transparent resin layer contains a resin which is insoluble in water or has water resistance. The third transparent resin layer can suppress mixing of the second transparent resin layer with the first transparent resin layer and can make the second transparent resin layer less likely to be damaged by the first transparent resin layer. Therefore, a surface of the second transparent resin layer is made smooth and electrical conductivity is made uniform.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA-SHI OSAKA 540-6207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsui, Taisuke Osaka, JP 23 32
Tsujimoto, Akira Nara, JP 48 727
Yokogawa, Hiroshi Osaka, JP 19 513

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00